Tag: 2nd Floor

  • Watch Tower, Level 2

    Having arrived home again, I compiled and digitally assembled the second floor of the Watch Tower project. As before, a bit of re-scaling to make the assembly easier, resizing down by about 1.5%. The new model is estimated at 21 hours and 52 minutes by the software, so it will likely be a 24 hour+…